Prerequisites
- No restriction of traffic safety and no disproportionate impairment of the ease of traffic
- No disproportionate restriction on public use or exclusion for a disproportionate period of time
- No disproportionate impairment of road components, road construction measures, the surroundings or the environment, urban planning or other public concerns, including the generation of income from the use of the road or public and private rights of third parties
- There must already be a bar area inside your establishment. The outdoor catering area must not be larger than the taproom area
There is no entitlement to a special use permit
Documents required
- Application (informal, application form or via inline service "Apply for outdoor catering")
- true-to-scale site plan,
- Information on the location, type and duration of the special use as well as the size of the pavement areas applied for and information on the remaining pavement width
Please note
Use may only begin if you have permission to do so.
Any use of the public street space that goes beyond common use or restricts it represents special use. It requires the permission of the approval authority and is subject to a fee. It is granted for a limited period and is subject to revocation and contains ancillary provisions
The use of the outdoor catering area is only permitted in front of one's own business, i.e. the use may not extend to the front of neighboring businesses.
A residual pavement width of between 1.50 m and 2.50 m should remain. The remaining sidewalk width depends on the respective location.
If you operate a restaurant business that requires a permit, the existing restaurant permit for outdoor catering must be extended
The installation of patio heaters and so-called customer stoppers (menus / standing boards) is not permitted.
Please also use the online service "Apply for outdoor catering" in the Forms, Services and Links area.
See links for discrepancies in Business Improvement Districts (BIDs) and design guides
Deadlines
The special use must be applied for in writing annually, at the latest 6-8 weeks before the planned installation date